About the Project
In Ashgabat city of Turkmenistan
Infrastructure and environment in the completed project
regulatory affairs contract
Our obligation has been completed.
All infrastructure systems of the project, drainage,
rainwater, wastewater, electricity (medium
voltage, low current, phone/data)
piping lines, potable water, garden
irrigation and fire hydrant infrastructure lines
excavation, piping, precast and on-site
manhole/valve chamber construction, backfilling
landscaping along with works
within the scope of excavation, filling, concrete and granite
curb, concrete covering pavement and concrete
Coating road works successfully
completed and employer acceptances
has been carried out.





